Library Flooring Project

We are postponing the Warminster Library flooring / carpet project for a few months while we pursue the replacement of the heat exchanger. Since the library is a designated warming shelter during times of winter storm emergency, we need to get this done as soon as possible.  Thank you for your understanding.

  • Tom Scott, Township Manager